Stop Letting Bad Schedules and Risk Destroy Your Construction Profits
From The Contender’s Edge · 22:45
Show by SMARTBUILD Construction Solutions
Bad schedules. Poor documentation. Risk nobody priced right. That’s how small and mid-size construction companies lose money. In this episode of The Contender’s Edge Podcast, we sit down with Greg Holness (FTI Consulting), a Professional Engineer and attorney with 30+ years of experience helping clients manage change, mitigate risk, and resolve construction disputes involving delay, disruption, acceleration, and lost productivity. He has developed, analyzed, and resolved claims on public and private projects of all sizes, and has drafted and negotiated hundreds of construction and design contracts, giving him deep insight into the terms that often drive disputes. We break down unrealistic deadlines, schedule mistakes, estimating risk, and what general contractors and subcontractors must do to protect their margins. If you run a construction company and want fewer disputes and stronger project control, this episode is for you.
More episodes of The Contender’s Edge
More episodes
- Won a Job Above Your Head? Fix This Before You Add AI
- Microsoft Copilot Doesn’t Understand Construction (Yet)
- The Field Intelligence Gap Holding Contractors Back
- Why Your Construction Team Rejects New Software
- How He Doubled a Construction Company From $50M to $100M+
- 25 Years, Same Crew: Why Nobody Quits This Contractor
- Field Experience vs Tech Thinking: Who Should Lead AI Adoption in Construction
- While Others Stayed Invisible, This Contractor Built a Brand on Instagram
- Overbilling in Construction, The Cash Flow Trap Most GCs Miss
- Why Construction Teams Reject Software and How to Fix It
PodSearch is a free, independent podcast search engine. Read about PodSearch, the privacy policy or contact us.