Americas Gold and Silver (TSX:USA) - Record Quarter Funds Higher-Grade Silver-Copper Push

From Company Interviews · 24:34

Show by Crux Investor

Interview with Oliver Turner, Executive Vice President of Corporate Development of Americas Gold and Silver Our previous interview: https://www.cruxinvestor.com/posts/americas-gold-silver-tsxusa-doubles-galena-hoisting-as-mexico-drilling-widens-the-upside-12052Recording date: 11th November 2026Americas Gold and Silver (TSX:USA) is running a two-asset funding model. Cosalá in Sinaloa, Mexico, generates cash, and the company is spending it on a sequenced rebuild of the Galena Complex in Idaho’s Silver Valley. Executive Vice President of Corporate Development Oliver Turner set out the plan following a record third quarter.Consolidated silver production reached 800,458 oz in the third quarter of 2026, with Cosalá at 415,879 oz and Galena at 384,579 oz. Year-to-date output is 2.3 Moz against 2026 guidance of 3.2 to 3.6 Moz at AISC of US$30-35/oz. Turner said the fourth quarter must be bigger than the third for the company to reach the low end of guidance, and that it is on track. First-half AISC was US$36.92/oz, above the guidance range. Available liquidity was US$113M at September 30, 2026, including US$63M of cash and US$50M undrawn on the SAF credit facility.At Cosalá, mining moved in 2026 from the zinc-dominant San Rafael zone into the EC120 orebody, which has a 7-year mine life under the current preliminary economic assessment. Turner said grades are running above 125 g/t Ag against a modeled average of just over 100 g/t, and drilling returned 20.5 m at 654.7 g/t Ag and 1.5% Cu just outside the 2025 Inferred boundary. The company plans to update the EC120 numbers next year.At Galena, the team used time studies that follow one ton of rock from face to mill. The first round identified hoisting and the mining method as the primary bottlenecks. The No. 3 Shaft skipping rate rose from 40 to 105 tph, hoisting is targeted at 1,350 stpd, and the mine is shifting from underhand cut and fill to long hole stoping toward a 70/30 split. Turner said 23 long hole stopes have been mined to design limits. Secondary fixes followed: four new grizzlies cut tram loading from 5 minutes to 20 seconds per 4-ton car, fiber optics now run through the mine, and Turner cited a 30% improvement in breaking rock at the face.The next phase targets grade as well as tonnage. Galena’s silver-copper ore carries roughly 2 times the silver grade of its silver-lead ore, and reaching it requires waste development. Turner said the mine had about a month of waste development ahead of mining when the team arrived, against a rule of thumb of about 2 years. The paste fill plant is due for completion in the first quarter of 2027, the company is validating dry stack tailings, and the mill is targeted to rise from about 750 to 1,200 stpd.Crescent, 9 miles away, will feed the Galena mill once a secondary egress is connected, and the presentation describes potential for about 1.5 Moz/yr. Turner described a first target of 5 Moz/yr at Galena, with engineering for a larger complex running well into 2027.Learn more: https://www.cruxinvestor.com/companies/americas-gold-silver-corporationSign up for Crux Investor: https://cruxinvestor.com/subscribe

More episodes of Company Interviews

More episodes

PodSearch is a free, independent podcast search engine. Read about PodSearch, the privacy policy or contact us.