i-80 Gold (TSX:IAU) - Fully Funded, Lone Tree Restart Anchors Multi-Mine Nevada Growth Plan

From Company Interviews · 26:08

Show by Crux Investor

Interview with Richard Young, President & CEO of i-80 Gold Our previous interview: https://www.cruxinvestor.com/posts/i-80-gold-tsxiau-granite-creek-feasibility-done-lone-tree-refurbishment-on-track-for-2027-12201Recording date: 11th November 2026i-80 Gold Corp. is in the middle of a two-project build in northern Nevada that management says will turn a small, high-cost producer into a mid-tier one. Speaking in Zurich, President & CEO Richard Young said the company produces 40,000 to 50,000 oz of gold a year today. It is targeting 150,000-200,000 oz in 2028, 400,000-500,000 oz in the early 2030s, and more than 600,000 oz by the mid-2030s. He said the company is fully funded for the plan.The center of the plan is the Lone Tree plant, a $430M refurbishment of an autoclave and CIL facility. Work began in Q3 2025. Procurement is about 80% complete and trending about 1% under budget. Commissioning is targeted for late 2027. i-80 says it is one of only 2 companies in Nevada with permitted autoclave facilities, alongside Nevada Gold Mines. Young said the restart will cut processing costs by about $1,500/oz by ending the toll milling that currently handles i-80’s refractory ore. He estimated long-term AISC at about $2,000/oz for the underground mines and $1,500/oz for the open pits, for a blended figure near $1,750/oz.Granite Creek Underground is the producing mine. Its September 2026 FS declared an initial reserve of 556,500 oz at 7.87 g/t Au, with an 8.5-year life and AISC of $1,915/oz for 2028-2032 at $2,750 gold. M&I resources rose 229% from the PEA. Young expects drilling to extend the life to 15-25 years. Two new dewatering wells and a water treatment plant are being commissioned in Q4 2026 to lower the water table and lift mining rates toward about 75,000 oz a year.Archimedes, the second underground mine, starts ore mining in Q4 2026 and is on schedule and budget. Upper-zone material is mostly oxide and heap leachable. Leaching on Ruby Hill’s existing permitted pads costs about $10-15/t, against roughly $150/t to truck and autoclave refractory ore at Lone Tree. i-80 lowered the cut-off grade from 5 g/t to 4 g/t as a result. Because Granite Creek and Archimedes can fill Lone Tree for at least a decade, Cove has been deferred.Mineral Point is the step change. It is a ~$1B heap leach open pit, with about a third of the cost being a year of pre-strip, targeting ~300,000 oz AuEq a year for 20-25 years. It holds about 7.5 Moz AuEq in M&I resources. The first 35 holes of the 2026 program included 19 step-outs, all mineralized, and one returned 1.33 g/t Au and 39.2 g/t Ag over 225.6 m. Permitting starts late 2026. A bank revolver is planned as backup liquidity without further dilution.Learn more: https://www.cruxinvestor.com/companies/i-80-goldSign up for Crux Investor: https://cruxinvestor.com/subscribe

More episodes of Company Interviews

More episodes

PodSearch is a free, independent podcast search engine. Read about PodSearch, the privacy policy or contact us.